Professional multiple project tracking template for Excel featuring a visual dashboard, Gantt chart, automated progress tracking, and multi-project task management. Track deadlines, assignments, and completion status across all your projects in one spreadsheet.XLSX

Free Multiple Project Tracking Template Excel: Download Now

This Multiple Project Tracking Template Excel is a free, professionally designed spreadsheet that lets you manage all your projects from one central location. It includes a visual dashboard with bar charts and Gantt chart, automated progress calculations, and organized task management — no complex software required.

  • Visual Dashboard: Bar charts and a Gantt chart update automatically, giving you a real-time overview of every project’s status.
  • Automated Progress Tracking: Enter task completion percentages and the template calculates overall project progress, remaining days, and task breakdowns instantly.
  • Multi-Project Task Management: Assign tasks to specific projects, set responsible team members, define start dates and durations — all in one organized sheet.

Multiple Project Tracking Template Excel (Latest)

What’s Inside This Template

This template includes three sheets — Dashboard, Projects, and Tasks — each designed to give you full visibility and control over your project portfolio.

Dashboard Sheet

The Dashboard provides an overview of all your projects with visual charts and a Gantt chart for tracking any selected project.

Multiple Project Tracking Excel Template - Dashboard

  • Projects Bar Chart: Quick visual overview of progress across all projects.
  • Project Selection Dropdown: Select a specific project to view its details.
  • Overall Project Progress: View the completion percentage of the selected project.
  • Task Completion Breakdown: See tasks categorized by status — Not Started (0%), In Progress (1–25%, 26–50%, 51–75%, 76–99%), and Completed (100%).
  • Gantt Chart: Visual timeline showing all tasks for the selected project with their dependencies and scheduling.

Projects Sheet

Enter and manage details for all your projects in one table. Aggregated columns update automatically based on your task entries.

Multiple Project Tracking Excel Template - Projects

  • Project Name: Identify each project clearly.
  • Tasks: Total number of tasks associated with the project.
  • Start / End: Earliest start date and latest end date across all tasks.
  • Days: Total estimated days required to complete the project.
  • % Progress: Overall completion percentage calculated from individual tasks.
  • Remaining: Estimated days until project completion.

Tasks Sheet

Define and manage individual tasks within each project. This is the core data entry sheet that drives the Dashboard and Projects views.

Multiple Project Tracking Excel Template - Tasks

  • Project: Assign each task to a project using the dropdown menu.
  • Task: Name and describe each task clearly.
  • Responsible: Assign ownership to a team member.
  • Start Date: Planned start date for the task.
  • Days Req.: Estimated number of days to complete the task.
  • Progress: Update the completion percentage (0–100%) as work progresses.

Each sheet is connected through Excel formulas — data entered in the Tasks sheet automatically feeds into the Projects sheet and Dashboard, so you never have to manually update summary numbers.

How to Use This Template

Getting started takes just a few minutes. Follow these steps:

  1. Download the Template: Click the download link above to get the free Excel file. Open it in Excel (2016 or later) or Google Sheets. If you need help, see our guide on creating a new workbook.
  2. Add Your Projects: Open the Projects sheet and enter your project names. Leave the aggregated columns blank — they populate automatically from the Tasks sheet.
  3. Add Your Tasks: Switch to the Tasks sheet and list all tasks for each project:
    • Assign each task to a project using the dropdown.
    • Set a responsible person, start date, and estimated days.
    • Update the progress percentage as work is completed.
  4. Review the Dashboard: The Dashboard updates automatically. Use the bar chart for a portfolio overview, or select a specific project to see its Gantt chart and task breakdown.
  5. Share and Collaborate: Distribute the file to your team so members can update their own tasks. For tips on working with shared files, see our guide on opening multiple workbooks.

For individual projects that need deeper planning before they go into this tracker, use our Project Plan Template to define tasks and Gantt chart timelines, then transfer the summary into this multi-project tracker.

How to Customize This Template

The template works out of the box, but you can adapt it to fit your workflow:

  • Add Project Sheets: Create a dedicated sheet for each project with goals, stakeholders, and detailed notes. Our Project Charter Template provides a ready-made structure for this.
  • Use Color Coding: Apply colors to differentiate projects, highlight priority tasks, or indicate completion status. Excel’s built-in features like Conditional Formatting make this easy.
  • Add Conditional Formatting: Set up rules to automatically highlight overdue tasks in red, in-progress tasks in yellow, and completed tasks in green.
  • Expand the Columns: Add columns for budget tracking, risk assessment, or resource allocation as your needs grow.
  • Break Down Tasks Further: For complex projects, use a Work Breakdown Structure Template to decompose tasks into subtasks before entering them here.
  • Share with Your Team: Distribute the file so team members can update their own tasks directly in the spreadsheet.

Methods for Tracking Multiple Projects

There’s no single right way to track multiple projects. The best approach depends on the number of projects, team size, and level of detail you need. Here are the most common methods.

Portfolio Dashboard Method

This is what our template uses. All projects are listed in one view with summary metrics (progress, dates, remaining days), and you can drill into any project’s tasks and Gantt chart. It works best when you need a quick overview across 5–20 projects without switching between files.

Separate Sheets per Project

Each project gets its own worksheet within the same workbook, with a master summary sheet pulling data from all of them. This gives each project more space for detailed task breakdowns, notes, and custom columns. Best for teams managing 3–8 complex projects that each need individual project plans.

Master Task List Method

All tasks across all projects go into one flat list, tagged by project name. You use filters and sorting to view by project, by person, or by deadline. This is the simplest approach and works well for small teams with many small projects. Our Action Items Template follows this pattern.

Gantt Chart Consolidation

Each project’s timeline is visualized on a single combined Gantt chart, showing how projects overlap and where resource conflicts might occur. Our Gantt Chart Templates can be adapted for this view, or you can use the built-in Gantt chart on this template’s Dashboard.

Which method to choose

  • 5–20 projects, need overview: Portfolio Dashboard (this template)
  • 3–8 complex projects, need detail: Separate Sheets per Project
  • Many small projects, small team: Master Task List
  • Need to see timeline conflicts: Gantt Chart Consolidation

Single Project vs Multiple Project Tracking

Understanding when to use a single project tracker versus a multi-project tracker saves you from outgrowing your tools or over-engineering your setup.

When to use a single project template

Use a dedicated Project Plan Template when:

  • You’re managing one project with 20+ tasks that need a detailed Gantt chart.
  • The project requires in-depth resource allocation, risk tracking, or budget management.
  • You need a standalone document to share with a client or stakeholder.
  • The project has its own dedicated team that doesn’t overlap with other projects.

When to use a multi-project tracker

Use this Multiple Project Tracking Template when:

  • You’re managing 3+ projects simultaneously and need a portfolio view.
  • You need to see cross-project deadlines and identify scheduling conflicts.
  • One person or team is working across multiple projects and needs to balance workload.
  • Leadership needs a high-level status report across all active projects.

Using both together

The most effective workflow combines both: use a Project Plan Template for detailed planning of each individual project, then feed the summary data (project name, start date, end date, overall progress) into this multi-project tracker for the portfolio view. Start each project with a Project Charter to define scope, break it down with a WBS Template, build the detailed plan, and then track everything at the portfolio level here.

Excel Tips for Multi-Project Tracking

These spreadsheet techniques will help you get more out of the template.

Use Data Validation for project dropdowns

The Tasks sheet uses a dropdown to assign tasks to projects. To add new projects, update the source list in the Projects sheet first — the dropdown in the Tasks sheet pulls from it automatically. If you need to set up dropdowns from scratch, use Data → Data Validation → Allow: List. Learn more about this in our Excel Features guide.

Use SUMIFS for cross-project reporting

Create a summary row that totals tasks, days, or progress across all projects using =SUMIFS(). This is useful for portfolio-level metrics. For a full list of available functions, see our Excel Formulas and Functions reference.

Apply conditional formatting for instant status

Set up rules to color-code progress: red for 0%, yellow for 1–50%, light green for 51–99%, and solid green for 100%. Apply this to the Progress column on both the Tasks and Projects sheets for instant visual status.

Use keyboard shortcuts for faster data entry

When entering tasks across multiple projects, Excel keyboard shortcuts save significant time. Ctrl+D fills down, Ctrl+; inserts today’s date, and Tab moves to the next cell — small time-savers that add up when entering dozens of tasks.

Freeze panes for large project lists

If you’re tracking 15+ projects with hundreds of tasks, freeze the header row and project name column so they stay visible as you scroll. Go to View → Freeze Panes. For more tips on navigating large spreadsheets, see our guide on working with worksheets.

Automate with Macros

For advanced users, Excel Macros can automate repetitive tasks like generating weekly status reports, archiving completed projects, or sending email reminders for overdue tasks.

Why Use Excel for Multiple Project Tracking

Excel is one of the most practical tools for managing multiple projects, especially for teams that don’t need complex project management software.

  • Centralized Organization: Consolidate all project information into a single, organized spreadsheet instead of juggling separate files.
  • Clear Visibility: See project progress, tasks, deadlines, and resource allocation at a glance through the built-in Dashboard.
  • Easy Collaboration: Share the file with your team for real-time access and updates — no special software licenses needed.
  • Built-in Automation: Use formulas and conditional formatting to reduce manual tracking work.
  • No Extra Cost: Excel is available on most computers. If you don’t have it, the template also works in Google Sheets. New to Excel? Our What is Excel guide covers the essentials.
  • Scales with your needs: Start simple with 3–5 projects, then expand by adding columns, sheets, or integrating with other templates from our Project Management Templates collection.

Common Mistakes When Tracking Multiple Projects

Avoid these pitfalls that derail multi-project tracking efforts:

  • Not updating regularly: A tracking spreadsheet is only useful if it reflects reality. Set a recurring time (weekly or bi-weekly) to update all project progress. Stale data leads to bad decisions.
  • Tracking too much detail: A multi-project tracker should show portfolio-level status, not every subtask. Keep detailed task breakdowns in individual project plans and use this tracker for summaries.
  • No clear ownership: Every task needs a responsible person. Tasks with no owner don’t get done. Assign names, not team names — “Marketing team” isn’t accountable, “Sarah” is.
  • Ignoring dependencies across projects: When projects share team members or resources, a delay in one project cascades into others. Use the Gantt chart view to spot overlapping timelines and resource conflicts.
  • Not defining “done”: What does 100% mean for each task? Without a clear definition of completion, progress percentages become meaningless. Define acceptance criteria for key deliverables in your project charter.
  • Using one file for everything: If a project needs detailed risk management, budget tracking, or a full WBS, create a separate file using our WBS Template or Project Schedule Template. Feed summaries back into this tracker.

Frequently Asked Questions

How to manage multiple projects effectively?

Use a centralized template to consolidate all project information, define clear goals and timelines for each project, update progress regularly, and maintain consistent communication across your team. Start each project with a project charter to align stakeholders, then track everything in one portfolio view.

What is the best way to track multiple projects in Excel?

A dedicated template with built-in dashboards, Gantt charts, and task tracking is the most efficient approach. It keeps all project data in one place and provides visual clarity for reporting and decision-making. This template provides all three out of the box.

How can I create a Gantt chart in Excel for multiple projects?

You can build one manually using Excel’s bar chart feature, or save time by using a pre-built template like this one, which includes an integrated Gantt chart that updates automatically. For dedicated Gantt chart options, see our Gantt Chart Templates.

What are the benefits of using Excel for project management?

Excel is accessible, cost-effective, highly customizable, and integrates with other Microsoft Office tools. It handles tasks, resources, budgets, and timelines efficiently. For a deeper dive, see our guide on what Excel is and why it’s essential.

How many projects can I track in this template?

There’s no hard limit. The template works comfortably with 5–20 projects and hundreds of tasks. For larger portfolios (20+ projects), consider splitting into multiple workbooks by department or program and maintaining a master summary sheet.

Can I use this template in Google Sheets?

Yes. The template is a standard .xlsx file that opens in Google Sheets, LibreOffice Calc, or any application that supports the Excel format. Some advanced conditional formatting may need minor adjustments in Google Sheets.

What’s the difference between this and the Project Plan Template?

The Project Plan Template is designed for managing a single project in depth — with a detailed Gantt chart, task dependencies, and resource tracking. This Multiple Project Tracker gives you a portfolio view across many projects. Use both together: plan each project individually, then track the portfolio here.

How do I add a new project to the tracker?

Add the project name to the Projects sheet. Then switch to the Tasks sheet and start adding tasks, assigning each one to the new project using the dropdown. The Dashboard automatically includes the new project in its charts and Gantt view.

Can I track project budgets in this template?

The default template doesn’t include a budget column, but you can easily add one. Insert a “Budget” column in the Projects sheet and a “Cost” column in the Tasks sheet, then use Excel formulas like SUMIFS to aggregate costs per project. For dedicated budget tracking, see our Budget Templates.

Build a complete project management system with these complementary tools from our Project Management Templates collection.

Project Management Templates

Premium Templates

Excel Learning Resources

More Free Templates

About the Author: PNRao

Hi – I'm PNRao, founder of Excelx. With over 20 years of experience in Project Management and Automation, I specialize in building high-performance systems that streamline complex workflows. My mission is to provide you with professional-grade Project Management templates—from automated Gantt charts to resource workload dashboards—powered by Excel, VBA, and Power BI. Whether you are managing a small team or a global portfolio, you'll find the tools here to transform your data into strategic action.

Share This Story, Choose Your Platform!

120+ PROFESSIONAL

Project Management Templates

120 Premium Project Management Templates Bundle
  • ✅ 50+ Excel Templates
  • ✅ 50+ PowerPoint Templates
  • ✅ 25+ Word Templates

⭐ Trusted in 100+ countries

50 Comments

  1. Taylor Brown July 20, 2024 at 12:59 am - Reply

    Super easy to use Free Multiple Project Tracking Template is really a lifesaver. Thanks for sharing such useful spreadsheet for free

    • PNRao July 26, 2024 at 12:02 pm - Reply

      We are glad it helped! You’re very welcome!

  2. mohammed August 4, 2024 at 9:03 am - Reply

    i want to add more projects but i cant could you please help my

  3. Andrew October 21, 2024 at 9:51 pm - Reply

    Hi, this sheet loads as protected. Is there a password required to Unprotect?

  4. Olivia Rivera January 2, 2025 at 7:00 pm - Reply

    This template has made managing multiple projects so much easier. Thank you!

    • PNRao January 3, 2025 at 2:01 pm - Reply

      Thank you so much! I’m thrilled to hear it’s helping you stay organized. Let me know if you need anything!

  5. Sarah Williams January 4, 2025 at 4:01 am - Reply

    Can this template handle over 20 projects at a time?

    • PNRao January 5, 2025 at 12:35 pm - Reply

      Yes, the template can handle multiple projects efficiently. Let me know if you need tips for customization!

  6. Jack White January 8, 2025 at 3:05 pm - Reply

    This template has saved me so much time managing my projects. Thank you!

    • PNRao January 10, 2025 at 12:28 pm - Reply

      We are so glad to hear that! If you have any suggestions, we would love to hear them!

  7. Tom February 20, 2025 at 9:16 am - Reply

    The Free Multiple Project Tracking Template is incredibly helpful! It’s easy to use and makes tracking multiple projects a breeze. Highly recommended for anyone looking to stay organized and manage tasks efficiently!

    • PNRao February 27, 2025 at 9:18 am - Reply

      Thank you for your feedback! We’re so glad to hear that the Multiple Project Tracking Template has been helpful for you. We hope it continues to assist you in staying organized and managing your projects effectively. If you have any suggestions or need further assistance, feel free to reach out!

  8. Hui February 26, 2025 at 5:31 am - Reply

    can you track resources leave and partial allocation to a task or project? i.e. one resource may be working on a few projects simultaneously?

    • PNRao February 27, 2025 at 9:11 am - Reply

      Yes, you can create same task and assign to a different person of project resource.

  9. David Brown March 6, 2025 at 10:20 am - Reply

    Does the Gantt chart update automatically as tasks are completed?

    • PNRao March 11, 2025 at 12:21 pm - Reply

      Yes, the Gantt chart updates dynamically based on task progress. Let me know if you have any questions!

  10. Rene April 10, 2025 at 1:36 am - Reply

    Hi, can this template assigns a task to different projects? i.e. Project 1 owner can track the progress of task A under another person, and task A belongs to both Proj 1 and Proj 3

    • PNRao April 10, 2025 at 9:09 am - Reply

      Hi, You can create separate list of Tasks, then create drop down list (using Data Validation) to assign the same tasks to the different project. This method is handy when you have common list of tasks for multiple projects.

      Hope this helps!
      PNRao

  11. Kalpana Dahiya May 13, 2025 at 5:59 pm - Reply

    How many projects can the paid version handle ? This one- Multiple Project Tracking Excel Template. Will I able to delete your copyright from the paid version ?

    • PNRao June 12, 2025 at 7:51 am - Reply

      The paid version can handle any number of projects, limited only by Excel’s technical limits.
      The file includes a License sheet for transparency and compliance. We recommend keeping it for your records — you’re allowed to hide the License sheet, but not remove it.
      You are free to customize the following sheets to suit your needs:
      •Dashboard, Projects Summary, Data Sheet
      You may also remove the Intro sheet if you no longer need it.

  12. Yogik Setyawan July 23, 2025 at 1:35 am - Reply

    I want to buy premium version

  13. LH July 24, 2025 at 11:10 am - Reply

    Does the template work with Excel for Mac?

    • PNRao July 24, 2025 at 3:33 pm - Reply

      Yes, the template works seamlessly with Excel for Mac.

  14. LevelPM July 24, 2025 at 4:18 pm - Reply

    Can the Gantt chart be adjusted to display hourly tasks instead of daily?

    • PNRao July 25, 2025 at 3:36 pm - Reply

      Currently, it’s set for daily tasks, but you can modify it for hourly tracking. Let me know if you need help!

  15. Ethan B July 24, 2025 at 10:17 pm - Reply

    The color-coded progress bars make tracking so much easier!

    • PNRao July 25, 2025 at 10:38 pm - Reply

      I’m so glad to hear that! Visual clarity is key to efficient project management.

  16. Dipk July 26, 2025 at 6:17 pm - Reply

    Can I link this template to other Excel sheets for automation?

    • PNRao July 27, 2025 at 3:39 pm - Reply

      Yes, you can use formulas or macros to link this template to other Excel files for automation.

  17. Jon July 28, 2025 at 6:16 pm - Reply

    Does this template support tracking team member workload?

    • PNRao July 29, 2025 at 3:11 pm - Reply

      Yes, you can add a workload tracker to the Tasks or Projects sheet to monitor team assignments.

  18. Novel July 29, 2025 at 10:16 am - Reply

    Can I add a priority column to the task list?

    • PNRao July 30, 2025 at 10:12 am - Reply

      Yes, you can easily customize the Tasks sheet to include a priority column.

  19. Ken July 30, 2025 at 3:15 pm - Reply

    Does the progress percentage auto-calculate based on task completion?

    • PNRao July 31, 2025 at 12:12 pm - Reply

      Yes, the template auto-calculates progress based on task completion percentages entered in the Tasks sheet.

  20. Justin July 30, 2025 at 6:15 pm - Reply

    Can I use this template to track resources across multiple projects?

    • PNRao July 31, 2025 at 11:12 pm - Reply

      Yes, you can add a resource tracking section to the template. Let me know if you need guidance!

  21. Omar July 31, 2025 at 12:14 pm - Reply

    This template is perfect for small teams managing multiple projects.

    • PNRao August 1, 2025 at 4:13 pm - Reply

      Thank you! I’m glad it’s working well for your team. Let me know if there’s anything more you need!

  22. Nile August 1, 2025 at 12:13 pm - Reply

    Can I add additional columns to the Projects sheet?

    • PNRao August 2, 2025 at 3:10 pm - Reply

      Yes, the Projects sheet is fully customizable to suit your specific requirements.

  23. Aija September 8, 2025 at 3:36 am - Reply

    Hello! Can I in Task tab filter by Project, Responsible or Progress? For example, I want to see only project X tasks. Thanks!

    • PNRao September 8, 2025 at 8:13 am - Reply

      Currently, you can filter by Projects, you can easily customize to filter by Responsible, Status or Progress.

  24. Aija September 17, 2025 at 6:34 am - Reply

    Thanks! Interesting that possibility to add filter is disabled. What could be the reason for this?

    • PNRao November 3, 2025 at 3:43 am - Reply

      That’s a great question! The filter capability is one of the advanced features included in our Premium Template. We’ve designed the free version to be simple and straightforward, while the premium version unlocks full customization, including filters, and much more.

  25. AK November 19, 2025 at 9:56 am - Reply

    Is this no longer free? The link leads me to pay option only.

    • PNRao November 28, 2025 at 11:21 pm - Reply

      Hi! It is definitely still free. The button on this page is strictly for the Free Version download. Please go ahead and use it; you will not be charged.

      ℹ️ This free version allows you to plan up to 10 projects with up to 100 tasks.
      👉 The link to the Premium version (for unlimited projects) is separate and can be found in the Intro sheet after you download the file.

      Hope this helps!